Wow, things are really starting to wrap up now. There isn't really anything left to do expect make a final "punch-list" of things to fix before we sign-off that everything is done. A lot of seemingly little things were accomplished over the last couple of days.
Our tile floor and back splash have been sealed and are done
 |
The tile floor. |
 |
Back splash with new outlet. |
The electricians must have been by today to finish up all of our light installations. We now have our new pendant lights installed and they look better than expected.
 |
Pendant/Accent lights. |
Our under cabinet lights were also installed.
 |
Buffet with under cabinet lights on. |
All of our appliances have been re-installed. Unfortunately our dishwasher door has started squeaking.
 |
A dark picture trying to show off the under cabinet lights |
Apparently one part of the design was to extend the cabinet above our microwave a bit. Unfortunately that covers the exhaust vents for the microwave so that has to be fixed somehow.
 |
View of the cabinet over the microwave. Notice how the other door is covering the vents. |
Our new sink and disposal are all hooked up.
 |
Pork Chop doing an inspection on the new plumbing. |
The next step is preparing our punch-list of things that need to be fixed. Our preliminary list:
- Fix the microwave so the vents aren't covered up
- Fix the seams in the granite
- Stop the squeak in the dishwasher door
- Level the oven
- Make sure all the drawer faces are in line.
If you have any other suggestions on things to fix/test let us know.