Friday, September 30, 2011

Lights, Appliances, Disposal! We're almost done!

Wow, things are really starting to wrap up now. There isn't really anything left to do expect make a final "punch-list" of things to fix before we sign-off that everything is done. A lot of seemingly little things were accomplished over the last couple of days.

Our tile floor and back splash have been sealed and are done

The tile floor.
Back splash with new outlet.
The electricians must have been by today to finish up all of our light installations. We now have our new pendant lights installed and they look better than expected.

Pendant/Accent lights.
Our under cabinet lights were also installed.

Buffet with under cabinet lights on.

All of our appliances have been re-installed. Unfortunately our dishwasher door has started squeaking.
A dark picture trying to show off the under cabinet lights

Apparently one part of the design was to extend the cabinet above our microwave a bit. Unfortunately that covers the exhaust vents for the microwave so that has to be fixed somehow.
View of the cabinet over the microwave. Notice how the other  door is covering the vents.

Our new sink and disposal are all hooked up.

Pork Chop doing an inspection on the new plumbing.
 The next step is preparing our punch-list of things that need to be fixed. Our preliminary list:

  • Fix the microwave so the vents aren't covered up
  • Fix the seams in the granite
  • Stop the squeak in the dishwasher door
  • Level the oven
  • Make sure all the drawer faces are in line.
If you have any other suggestions on things to fix/test let us know.